Global Risk Analysis
- Construction of a residential and long-term care center in Gatineau, Qc.
- Alma 2 Project, production capacity increase of the Alma Smelter of Rio Tinto Alcan (Alma QC)
- Amperage increase project of Arvida Smelter, Project to be constructed while plant is in operation. (Jonquière, QC)
- Riedhammer Furnace Rebuild Project without disturbing the operation of the furnace. (Jonquière, QC)
- Noise Reduction Project at the Isle Maligne Powerhouse. (Alma, QC)
- Capacity Increase project of the Manouane Hydroelectric Reservoir Manouane (QC)
- Headgate Rebuild Project at the Isle-Maligne Powerhouse. (Alma, QC)
- Breaker Feeder Replacement Project at Grande-Baie Smelter (Ville de la Baie, QC)
- Rebuild of the Pot Control equipment at Laterrière smelter (Chicoutimi, QC)
- Automation of the Potroom Cranes at Laterrière smelter(Chicoutimi, QC)
- Many confidential Research and Development projects. (Canada)
- Environnemental Réhabilitation Project of a portion of St-Louis River (Beauharnois, QC)
- Project to measure the amperage of the potroom at the Sebree Smelter (Sebree, Kentucky)
- Substation Rebuild Project Sebree Plant (Sebree, Kentucky)
- Pot Addition Project at the Shawinigan Smelter(Shawinigan, QC)
- Computerized System for railcar management Roberval-Saguenay Railway.
- Replacement of the corporate maintenance computer system by SAP.
- Computerized Project Management system for RTA plant projects. (Jonquière, QC)
- Power transformer addition for Ningxia Smelter in China.
- Automation of the spent pot lining treatment plant (Jonquière, QC)
- Business Risk Analysis for every primary metal plants of RTA in North America.
- Social risks analysis for RTA Saguenay-Lac St-Jean
- Installation of 22 reactors in in the gaz treatment system of Grande-Baie plant.
- Chute des Passes Power house revamping project.
- Green Project (biomass for boilers) at Vaudreuil Works (Jonquière, Qc.).
- Maaden Smelter in Saudi Arabia project, every shop studied ( at conceptual engineering, preliminary engineering and detail engineering phases).
- Reliability of the power supply of Laterrière Smelter (Laterrière, Qc.).
- Gazogene replacement projects at the fluoride plant of Jonquière, Qc
- Kemano Power House Tunnel Inspection using a remote control submarine. B.C.
- Floating warf for tugs at Port-Alfred.
- Amperage Increase project for Grande-Baie Plant(Saguenay, Qc.)
- Amperage increase project for Alma smelter.
- Amperage Increase project for Sebree, Kentucky.
- Amperage Increase project for Laterrière Smelter. (Saguenay, Qc)
- Cooling tower replacement for Lapointe works of Rio Tinto Alcan, Jonquière.
- New Water treatment for casting center, Grande-Baie Plant.
- Rebuild of Shawinigan casting center.
- Diavik Diamond Mine A21 pre-feasibility project (comparative risks analysis).
- Diavik Diamond Mine A21, feasibility study.
- Valorisation project of by-product of spent potlining plant.
- Iron Ore of Canada, Load out feasibility study.
- Process improvement of the spent potlining plant for RTA.
- Steam line project between Elkem Métal and Rio Tinto Alcan.